Unfortunately there will be no more availability for the rest of 2017. Construction teams rolled in October 5. Renovation goes full steam from now to the end of the year. It should be completed by mid January. New Photos in particular from the inside will also be available in January.

Here is what will be done:

* We will now have air-condition in all bedrooms
* The electricity system will be completely renewed
* All bathrooms will be completely overhauled, from small punchy color tiles to large sandstone plates and wooden lavatories…
* The pool bar (Summer Kitchen) will be completely overhauled, get a brand new gas powered BBQ a new fridge and a little bar.
* The former office will be turned into a library and can be converted to a 5th bedroom
* Two dining tables, combined up to 6.40 meter in length for hosting up to 22 guests
* The 1/2 bedroom downstairs will be turned into a media room/home theater with super large 65″ screen and Dolby surround sound system. And also this room can also be converted to a 6th bedroom
* The entire house will be painted new
* Guests will find all new box spring beds in all bedrooms (8)
* New high quality down feather bedding for all rooms and spare sets.

While the house could theoretically sleep 12 or even 14 we limit the number to 10 guests total.
We still have only 4 bathrooms (two with bath tub, two with showers).

Bathrooms in a new and very clean style will be installed this month (sample image).

Thanks to all the feedback we received. It is our goal to make Loth Lorien to one of the best experiences on the Riviera.

Share

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>